Keosauqua Bridge Replacement
I have been out of the country but it looks like they poured the deck and just have to finish the bridge approaches. After that, traffic will be re-routed on the new bridge and the old bridge will be removed. Then the new bridge will be widened and finally a bridge with two driving lanes, a 10 foot wide bike path and a 5 foot sidewalk.
Nieko Design | Projects | Aesthetics | Publications | Water | Blog | News | Stuart Nielsen